Walnut Grove Dam Disaster




Walnut Grove Dam Disaster



Walnut Grove Dam was constructed at a site approximately 20 miles northeast of Wickenburg, Arizona. Gold had been discovered in the area and a New York Investor, Wells H. Bates, wanted a dam built in order to supply water for hydraulic mining. He acquired the mining rights and then hired William P. Blake, a renowned geologist, to design and construct the dam. Blake worked with his sons on the dam beginning in February 1886.

Walnut Grove Dam Disaster
However, he was fired shortly after beginning work. He was replaced by E.N. Robinson a civil engineer from San Francisco. Robinson was unable to salvage any of the construction that Blake had begun and no design documents were available, so he largely started over. One of the aspects Robinson called for was a larger spillway. However, after Robinson had only been on the job for 4 months, he was fired. It is unclear exactly why, but he was then replaced by one of the New York Investors brothers who had no engineering or construction experience.

Managing a dam construction project from over 2,000 miles away presented many challenges. During the construction there were frequent complaints about low pay, poor oversight and quality control, an untrained work force, and high construction and design costs – by the time the project was complete there would be 5 different chief engineers on the job, each serving as superintendent (one would go on to become Governor of Arizona). Robinson’s larger auxiliary spillway would never be constructed.

After he left the project, the size of the spillway was debated, but ultimately a much cheaper, smaller spillway was constructed. Large storm events occurred in 1889, the year after completion, and made the need to expand the spillway clear. Work was being done on the spillway when it began to rain on February 16, 1890. It would rain on and off until February 22. This rain-on-snow flood event caused the dam to overtop, leading to failure on February 22, 1890.  The event was estimated by Liggett in 2010 using USGS regional regression methods to have a flood flow frequency of 1 in 25 years. More details